Connection between two Zyxel GS1920-48HPv2 over LACP
Hello,
i want to connect two Zyxel GS1920-48HPv2 switches together due to failover reasons via LACP but i get stuck here.
I have following setup as shown in the picture:
I have configured static LACP between Switches in Building 1 Ground Floor Rack 1 and Building 1 Ground floor Rack 2 but as soon i connect cables, both switches get unavailable.
I have the same configuration between Switches in Building 1 1st Floor and Building 1 Ground Floor Rack 1 - everything is working fine!
I have copied the configuration from the working setup to the other 2 switches but i can´t get it running.
Maybe somebody of you have an idea why?
Thanks in advance!
All Replies
-
Hi @mango122,
LACP group cannot be used cross-segment. I assume the LACP group between 1 floor and rack 1 is the same as the group between rack 1 and rack 2 since you said you copied the configuration. Please make one group as T1 and another as T2.
Please feel free to share rack 1 & 2's configuration so we can investigate deeper.
Zyxel Melen0 -
Hello,
thanks for your reply - i tried to change the Groups, but is still the same issue.
Please find configurations attached
Additional information: When i activate LACP protocol on Rack 2 the Ports are up without Switch is going Down. On Rack 1 the Ports are also up with State "BLOCKING" - as soon as i activate LACP on Rack 1 too, Switch is going down again.
0
Categories
- All Categories
- 415 Beta Program
- 2.4K Nebula
- 146 Nebula Ideas
- 96 Nebula Status and Incidents
- 5.7K Security
- 262 USG FLEX H Series
- 271 Security Ideas
- 1.4K Switch
- 74 Switch Ideas
- 1.1K Wireless
- 40 Wireless Ideas
- 6.4K Consumer Product
- 249 Service & License
- 387 News and Release
- 84 Security Advisories
- 29 Education Center
- 10 [Campaign] Zyxel Network Detective
- 3.5K FAQ
- 34 Documents
- 34 Nebula Monthly Express
- 85 About Community
- 73 Security Highlight