How to Implement: Setting Up AP Power Recycling with a Nebula Switch
Options

Zyxel_Jay
Posts: 227
Zyxel Employee





in Other Topics
Introduction
If you need to power on the AP only at specific times, this article explains how to power cycle the AP through the Nebula switch.
Using PoE Schedule for Power Recycling
Requirement: A Nebula Switch with PoE capabilities is required to set up power recycling for an AP.
Configuring PoE Schedule: The PoE Schedule feature in the Nebula Switch can be utilized to automate power cycling. This feature allows for scheduled powering off and on of the AP, which can be useful for routine maintenance or troubleshooting.
Reference
For detailed instructions on configuring the PoE Schedule, refer to the Zyxel community article: How to Configure PoE Schedule on Nebula Switch.
Tagged:
0
Categories
- All Categories
- 435 Beta Program
- 2.7K Nebula
- 176 Nebula Ideas
- 118 Nebula Status and Incidents
- 6.1K Security
- 428 USG FLEX H Series
- 298 Security Ideas
- 1.6K Switch
- 79 Switch Ideas
- 1.2K Wireless
- 44 Wireless Ideas
- 6.7K Consumer Product
- 274 Service & License
- 422 News and Release
- 88 Security Advisories
- 31 Education Center
- 10 [Campaign] Zyxel Network Detective
- 4.2K FAQ
- 34 Documents
- 34 Nebula Monthly Express
- 83 About Community
- 89 Security Highlight